long 2

Advertisement

The Arab Sea Ports Federation

long 1

Advertisement

Active Members

East Port Said Port , Egypt

East Port Said Port

Working Member

East Port Said Port , Egypt

General Manager of King Abdulaziz Port in Dammam
Mr. Naeem Bin Ibrahim El-Naeem

Overview

”East Port Said port is well-positioned to be a major transshipment hub and gateway port.”

Location

The port location is Latitude 29°39’ North and Longitude 32°21’ East.

  • Ultra-modern multi-purpose facility capable of handling large ships.
  • Purpose-built for future needs, with a basin width and entrance of 680m with direct access from the Gulf of Suez; basin depth of 17m.
  • Enhanced port automation and next generation container handling equipment.

The number of berths in the port is 39, including:

  • General cargo berths-containers and RO-RO berths.
  • Grain and fodder berths.
  • Unpacked cargo berths, cooled cargo berths and general cargo berths.

The depth of sea waters in such berths ranges from 9 up to 14 meters, while its total length is 7837 meters. Such berths are provided with modern equipment and installations for cargo handling and stowage, in addition to carrying it from the port, also forklift and other electronic lifts of different types, some of which are of 3.2.15 tons capacity. Moreover, lifts for unloading grains, receiving dock with a length reaching 4000 meters and the sea depth along the dock ranging between 4.5 and 6 meters.

They are represented in Authorities, associations, councils and administrations working in the field of the Arab Sea Ports facilities.

Berth Properties

StatementArea
Length of Navigational Channel14Miles
Width of Navigational Channel400Meters
Total port area181000000Square Meters
Water Area174.160.000Square Kilometers
Land area6.840.000Square Kilometers
Total area of container yards1545000Square meters
Total area of opened area yards2391850Square meters
Total area of covered storing yards181000Square meters
Tankers areaNot availableSquare meters

Implemented by Consortium

COWI Belgium

Project Planning and Management Ltd. Bulgaria

Engineering Features:

Dedicated Container Terminals:3000 m – 1.605.000 m².
Multi-Purpose Terminal:900 m – 322.000 m² [ G.C – L.B – D.B ].
RoRo Terminal:600 m – 212.000 m².
Port reception facility:100 m – 23.000 m².
Grain Terminal / VALC:500 m – 650.000 m².
AP Muller Container Terminal.Not available

Engineering Features

StatementArea
Length of Navigational Channel14Miles
Width of Navigational Channel400Meters
Total port area181000000Square Meters
Water Area174.160.000Square Kilometers
Land area6.840.000Square Kilometers
Total area of container yards1545000Square meters
Total area of opened area yards2391850Square meters
Total area of covered storing yards181000Square meters
Tankers areaNot availableSquare meters

Development Plan

The future development phase (2) two is to construct  new Quays to be added to the current capabilities of the berths and to raise the port’s classification in terms of berths numbers and  length.  The expansion works will maximize the Quays up to 14000M (Phase two adds up to 6000M length).
At the port’s backyards are three Logistic areas of total land  size of 24 KM2 to setup value-added activities and establish a logistic Hub.

First Green VALC – East Port Said Integrated Zone

A GREEN Added Value Logistics Center At East Port Said
Maximum Total Designed Capacity For Cargo Handling2000000Thousand Tons/Year
Maximum Total Designed Capacity For Containers Handling (TEU)900000TEU/Year
Largest Received Vessel (According To Its Draft)14Meters
Largest Received Vessel (According To Its Length)300Meters
Container Handling Rate2465TEU/Day
General Cargo Stevedoring Rate38356Tons/Day
Working Hours113974Hour
General Cargo Handled During The Year 20053850Thousand Tons
Containerized Handled Cargo During The Year 20058529Thousand Tons
Dry Bulk Cargo3882Thousand Tons
Liquid Bulk Cargo57Thousand Tons
Number Of Handled TEU During894809Thousand Tons/Container
Number Of Passengers During 2005-Passengers

Contact

AddressK.M 114, Kattameya old road, Ain Sokhna, Suez, Egypt.
Telephone+2 062 3590005
FAX
Email Addressinvest@sczone.eg